Welcome to the official website of Aojian Artificial Grass.
News Center
Cotact Us

FAX: 86-20-34005326

Email: aojian168@aojiansports.cn

Website: http://www.aagartificialgrass.com/

Your current location:Home · News
Kindergarten Rainbow artificial grass installation stpe
2018-10-10       16:27:05From:Aojian
Here are some points to note:
 
 
 
1. Foundation leveling, slope ratio and drainage channel construction;
 
 
 
2, because the entire artificial lawn is very heavy, must be aligned and then linked with tape.
 
 
 
3. Part of the lawn needs to be trimming and sewing with professional tools.
 
 
 
4, viscose should be used in real time.
 
 
 
5, filling quartz sand and rubber particles should be filled with machine to ensure smoothness.
 
 
Above is to do the kindergarten and football field artificial lawn construction process need to pay attention to the place, strictly follow the steps, should be able to get good results show, I hope this article can help you, hope it is helpful to you.










 

AoJian artificial turf industry Co. Ltd. (Brand: AAG) is a professional production of various kinds of football field turf, artificial turf landscape greening, artificial grass, decorative artificial grass, turf type factory made,

products sold at home and abroad! Our philosophy: innovation, to provide you with cost-effective artificial turf!
+86 20 89118366 ; +86 13660111959 Fax: 86-20-34005326
aojian168@aojiansports.cn

粤ICP备11088621号-6号 Stock code :364278

LINK: