Construction of artificial grass basketball court
2018-10-25       16:18:14From:Aojian
1. Checking basis
 
Measure the size of the check site, check the floor evenness, slope and check the appearance of the site. The foundation should have a certain degree of flatness, and the error of the 3 meter ruler is not greater than 3 millimeters. The slope is less than one percent, and the vertical is less than 1/1000. The foundation surface is clean, no crack, peeling, pitting and sand blowing. artificial grass
 
2. Cleaning sites
 
If there are more dust in the field, rinse, dry and clean the floor three times.
 
3. Planning lofting
 
According to the size of the site and the size of each lawn, the paving scheme is worked out and the bottom line is released. artificial grass
 
4. Paving stage
 
(1) The turf is moved into the field and spread out along the horizontal direction, and then pushed forward from one end of the longitudinal side to the other in turn. When spreading, the white lines woven on the turf are placed in the position of functional lines as far as possible, so as to reduce the number of cuts.
 
(2) Cut off the white straw line that is woven on the outer edge of the turf and can not be placed on the position of the function line, and put it aside for use. If the white line is woven separately, it must be cut into the white line by hand.
 
(3) The green turf joints lapped 2-3 cm, with a grass cutting knife from the lap center cut, so that the two sides of the turf as close as possible lap, and then cut with a paper cutting knife;
 
(4) Spread the 20-or 30-centimeter-wide connecting strip along the seam of the turf and put it under the turf. Make the seam of the turf in the middle of the connecting strip as far as possible (if it is wet by rain, dry it by half an angel). Then spread the glue evenly on the connecting strip with a rubber scraper, and then splice the two sides of the turf together to make the glue adhere to it. Take the tape. If the gap is widened after straightening, it can be cut apart at 2-5 cm intervals and stretched to the interface to ensure beautiful appearance.
 
(5) After the basic splicing of the turf, the accurate position of each function line and point is determined again by the pulling line, cut with a paper cutter, pull out the cut grass, put the connecting strip in, apply glue properly, put back the original prepared white grass line, cementation and compression. artificial grass
 
(6) When the turf is spread and spliced, the folded part of the turf needs to be opened with a cutting knife, butted straight, cut off the overlapping part, and then cemented.

AoJian artificial turf industry Co. Ltd. (Brand: AAG) is a professional production of various kinds of football field turf, artificial turf landscape greening, artificial grass, decorative artificial grass, turf type factory made,

products sold at home and abroad! Our philosophy: innovation, to provide you with cost-effective artificial turf!
+86 20 89118366 ; +86 13660111959 Fax: 86-20-34005326
aojian168@aojiansports.cn

粤ICP备11088621号-6号 Stock code :364278

LINK: