I believe that we are all familiar with the artificial lawn of traditional filled football field, which needs to be filled with quartz sand and rubber particles by machines. After filling, it also needs to be brushed and leveled by large machines. The process can be said to be quite tedious and requires a lot of manpower and material resources.And need not fill artificial grass is different, had used say!Not only the construction is simple, but also prepare all kinds of spare construction machines and do not need to fill quartz sand, particles, disassembly and assembly is convenient, site utilization rate is very high.
Step 1: basics
1. Basic cleaning
2. Basic white line positioning
3. Prepare the white line and cut it
Step 2: paving
1. Lay turf
2. Lay splicing tape
3. Glue the splicing belt
4. Adhesive splicing tape
5. Cut the white line splicing port
6. Embed and glue the white line
Step 3: fill in
1. Prepare and fill quartz sand
2, brush grass machine brush quartz sand
3. Prepare and fill black colloidal particles
4. The filling machine is filled with black colloidal particles
5. Use machine to brush quartz sand
6. Completion of construction
AoJian artificial turf industry Co. Ltd. (Brand: AAG) is a professional production of various kinds of football field turf, artificial turf landscape greening, artificial grass, decorative artificial grass, turf type factory made,
products sold at home and abroad! Our philosophy: innovation, to provide you with cost-effective artificial turf!
+86 20 89118366 ; +86 13660111959 Fax: 86-20-34005326
aojian168@aojiansports.cn
粤ICP备11088621号-6号 Stock code :364278